Method Statement For General Office Cleaning

By: Admin

Method Statement

  • (Safe System of Work)
  • Contract Name:
  • Address:
  • Ref: MS001
  • Description of Works:
  • (Main objective)
  • General- Cleaning
  • Expected Start and End Dates:
  • Assessment Date: Assessed By: NJG
  • Approved By:
  • Associated Health, Safety and Environmental Assessments:-
  • ( Risk Assessments, Hazardous chemical Assessments etc)
  • Risk Assessment 001 Slips, trips and falls, Contact with bleach or other chemicals,
  • Musculoskeletal disorders.
  • Contract Supervision & Training:-
  • ( Supervisor/s and Current Certification/training)
  • All management & Staff are fully competent on equipment and methods of operation.
  • Labour:-
  • ( Number of persons)(If Required List All Labour and their trades)
  • Max 2 per Contract unless otherwise specified
  • Plant, Tools & Equipment:-
  • (List all) Chemicals:-
  • Elec Floor Scrubber, Vacuum cleaners
  • Hand Tools, Mops Buckets
  • Basic General cleaning sprays and detergents
  • Welfare Facilities :
  • (Toilets, Washing Facilities & Drinking Water) First Aid Facilities:
  • (First Aider, Location of First Aid Box)
  • Client Facilities by prior agreement
  • First Aid Box carried in vehicle
  • Work Method (Key steps & stages of the work required)
  • Method of works: (Warning Signs/cones placed as required to warn persons of cleaning in progress.)
  • TOILET CLEANING
  • The following sequence is used:-
  • Cleaning the mirrors by using squeegee or paper towel.
  • Cleaning the sink
  • Prepare the hand towels or dispenser paper and clean it
  • Cleaning the bowls by using the extension brush and if required use the small brush
  • Cleaning the urinals
  • Cleaning the divisions
  • Maintaining clean walls
  • Supplying the dispenser paper for toilets and hands soap
  • Mopping floors
  • Supplying the toilet paper
  • Checking periodically the hands soap and fill it up if required.
  • Cleaning shower and divisions if applicable
  • The reason we are implementing the extension brush is to minimize the number of times the
  • cleaners are bending their low back through the process and work more comfortable
  • by improving their yield and reduce the tiredness. The Floors will be mopped using a wet then dry mopping method; any spills will be cleaned immediately.
  • The toilets divisions must be clean by using cloth and squeegee. This is the best and easy way to keep clean these areas and minimise the muscle movement and reducing the tiredness. The same procedure will be use to keep clean the walls. All staff members are required to use Gloves at all times.
  • KITCHEN CLEANING
  • The sequence of cleaning kitchens is described as follows
  • Wipe and clean all the benches, tables and surfaces for the kitchen.
  • Clean the sinks
  • Change the rubbish bags
  • Organise the chairs back to the original position. (All waste will be disposed of in the correct areas)
  • OFFICE CLEANING
  • The sequence of cleaning offices is described as follows:
  • Cleaner must check and change rubbish bags
  • windows frame dusting if required
  • Dusting surfaces from benches, tables, Photocopy and fax machine tables if required.
  • Vacuuming carpets (ensuring cables are not trailed as trip hazards)
  • Hand rails
  • Doors dusting Rubbish bags are to be deposited and collected later and taken to the rubbish collection point.
  • Cleaners Will Not attempt to manually force the rubbish bags by hand with the purpose of making more space. There is always a risk or hazard for chemicals, needles, blades etc.

  • About the Author:

    Compliments of http://www.method-statement-template.info A sister website with large numbers of pre completed Method Statements, Risk Assessments and Policies/Manuals.


    This Article is Brought to you by:

    Building and Construction Method Statements and Risk Assessments


    Method Statement Template Related Articles:

    Method Statement For General Office Cleaning

    Method Statement (Safe System of Work) Contract Name: Address: Ref: MS001 Description of Works: (Main objective) General- Cleaning Expected Start and End D...

    By: Admin

    Method Statements and Risk Assessments Price Reduction

    Our Prices for completed example Method Statements and Risk Assessments have been reduced from 8.99 to 5.99. ...

    By: NJG

    New Civils Pack

    Our sister site has added a new Roadwork Civils Pack to their website The Pack Contains:- Method Statement for setting out roadworks Method Statement for excavation and fill of new roadwork Method Statement ...

    By: NJG

    Updated Builders safety Related News:


    More Resources: